| Fire Hall 5 and Transit Mechanical HVAC Upgrades | | Wood Buffalo | 04.19.2021 | |
| 5161AE: Air Conditioning Contractor Services5161B: Heating, Ventilation and Air Conditioning Maintenance & Inspection... | |
| | |
|
| Centerfire Place Rink Boards and Structural Steel Replacement | | Wood Buffalo | 04.16.2021 | |
| 5176C: Metal Fabricators (Iron and Steel)5155C: Structural Steel Work Response Submission: Response Contact:... | |
| | |
|
| Fort Chip Admin Building Roof, Window and Door Replacement | | Wood Buffalo | 04.16.2021 | |
| 5177BA: Interior Fit-Up/Renovations Response Submission: Response Contact: Balacang, GraceyBuyer9909 Franklin... | |
| | |
|
| RFT-2021-523 - Eagle Ridge Slope Failure - Construction | | Wood Buffalo | 04.16.2021 | |
| | |
| | |
|
| 2020 Flood DRP Project #15 - Parks Asphalt Trail Repairs | | Wood Buffalo | 04.16.2021 | |
| 5131BI: Asphalt and Joint Sealing Services Response Submission: Response Contact: Elser, ShaunnahBuyer9909 Franklin... | |
| | |
|
| Fall Protection System Design and Installation | | Wood Buffalo | 04.15.2021 | |
| R019F: Consulting Services Response Submission: Response Contact: Burton, KristaBuyer9909 Franklin AvenueFort... | |
| | |
|
| Stonecreek Disc Golf Course - Design | | Wood Buffalo | 04.14.2021 | |
| R019F: Consulting Services Response Submission: Response Contact: Elser, ShaunnahBuyer9909 Franklin AvenueFort... | |
| | |
|
| Fort Chipewyan Water Tank Supply and Installation | | Wood Buffalo | 04.13.2021 | |
| N4520E: Tanks, Hot Water Storage (Domestic)N5430: Storage TanksN5430A: Tanks, Canvas, Water Response Submission:... | |
| | |
|
| Active Transportation Trails Phase 2 Construction - Abasand Connector Trail | | Wood Buffalo | 04.12.2021 | |
| N4710: Pipe, Tube and Rigid TubingN9330K: PLASTIC STRIP, RETRO-REFLECTIVE, PRESSURE SENSITIVE, MARKING... | |
| | |
|
| Clearwater Remediation (2021) | | Wood Buffalo | 04.12.2021 | |
| E110A: Environmental Site InvestigationB101B: Environmental Studies - Construction SitesE199D: Environmental... | |
| | |
|